Part Number : CK-104 LONG LEAD
Alternate P/N: CK104LONGLEAD
NSN : 5910-00-113-5499
Item Name : Capacitor Fixed Ceramic Dielectr
Manufacturer : Crl Components Inc
CAGE Code : 71590
FSC : 5910 Capacitors
Qty Available : 1542
Last Updated : 05-10-2024
Thank you for choosing ASAP Semiconductor’s website ASAP 360 Unlimited for your NSN part requirement. We have NSN part number CK-104 LONG LEAD in stock. This NATO part is manufactured by Crl Components Inc. It is listed as Capacitor Fixed Ceramic Dielectr. The national stock number that is associated with NSN part CK-104 LONG LEAD is 5910001135499. All the NSN parts we delivered such as CK-104 LONG LEAD are passed through quality checks.
Please fill out all of the required fields denoted by an * and a dedicated account manager will get back to you with a quote shortly. All request for quotes are answered within 15 minutes 24/7 x365.
Please fill out below form for Part Number CK-104 LONG LEAD “*” Symbols for mandatory fields
ASAP Semiconductor prides itself for providing the right technology at the right place just in time and at an aggressive price. Feel free to browse ASAP360Unlimited.com for other parts made by Crl Components Inc or parts that belong to the same federal supply 5910 Capacitors or federal supply group 59 Electrical and Electronic Equipment Components With over 20 million parts ready for immediate delivery around the globe, we will strive to be your first choice for purchasing.
Download the ASAP Semiconductor Mobile App to receive free ground shipping.
NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
---|---|---|---|---|---|---|
5910-00-113-5499 Item Description: Capacitor Fixed Ceramic Dielectr | 5910 | 001135499 | 0 | P | A | |
CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
U | A | A | 0 | |||
Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
833013-0001 | E | 1 | C | A |
MRC | Criteria | Characteristic |
---|---|---|
AAQL | BODY STYLE | W-O MTG FACILITIES TERMINAL S ON ONE SURFACE |
AARG | RELIABILITY INDICATOR | ESTABLISHED |
AARH | RELIABILITY FAILURE RATE LEVEL IN PERCENT | 0.0010 |
ABJT | TERMINAL LENGTH | 1.250 INCHES MINIMUM |
ADAQ | BODY LENGTH | 0.290 INCHES NOMINAL |
ADAT | BODY WIDTH | 0.290 INCHES NOMINAL |
ADAU | BODY HEIGHT | 0.090 INCHES NOMINAL |
AEBP | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO LENGTH | 0.200 INCHES NOMINAL |
AEBT | TERMINAL DIAMETER | 0.025 INCHES NOMINAL |
AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODE S |
AGAV | END ITEM IDENTIFICATION | MULTIPLE LAUNCH ROCKET SYSTEM MLRS |
CQBF | INSULATION RESISTANCE AT MAXIMUM OPERATING TEMP | 10000.0 MEGOHMS |
CQBQ | CAPACITANCE VALUE PER SECTION | 0.100 MICROFARADS SINGLE SECTION |
CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | -25.0 TO 15.0 WITH RATED VOLTAGE APPLIED SINGLE SECTION |
CQJJ | NONDERATED OPERATING TEMP | -55.0 DEG CELSIUS MINIMUM AND 125.0 DEG CELSIUS MAXIMUM |
CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 100.0 DC SINGLE SECTION |
CRTP | TOLERANCE RANGE PER SECTION | -10.00 TO 10.00 PERCENT SINGLE SECTION |
CWJK | CASE MATERIAL | PLASTIC |
CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 100000.0 MEGOHMS |
CWPM | DISSIPATION FACTOR AT REFERENCE TEMP IN PERCENT | 2.5000 |
CWSG | TERMINAL SURFACE TREATMENT | SOLDER |
NHCF | NUCLEAR HARDNESS CRITICAL FEATURE | HARDENED |
TEST | TEST DATA DOCUMENT | 81349-MIL-C-39014 SPECIFICATION INCLUDES ENGINEERING TYPE BULLETINS BROCHURES ETC. THAT REFLECT SPECIFICATION TYPE DATA IN SPECIFICATION FORMAT EXCLUDES COMMERCIAL CATALOGS INDUSTRY DIRECTORIES AND SIMILAR TRADE PUBLICATIONS REFLECTI |
TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD |
ZZZK | SPECIFICATION-STANDARD DATA | 81349-MIL-C-39014-2 GOVERNMENT SPECIFICATION |
Warranted inventory at competitive prices
Search the world's largest inventory of electronic components
All inventory ready to ship from our sellers
We sell only warranted and traceable parts
All Orders are Fulfilled in the U.S.A.
All shipments must comply with U.S.A export laws.
No exceptions.
The only independent distributor
with a NO CHINA SOURCING Pledge
“We Proudly Support Intrepid Fallen Heroes Fund that serves United States Military Personal experiencing the Invisible Wounds of War : Traumatic Brain Injury (TBI) and Post Traumatic Stress (PTS). Please visit website (www.fallenheroesfund.org) and help in their valiant effort”.
We're World's Largest Distributor for Aviation, Electronics and Electrical Connector Parts. Get an Instant Quote within 15 Minutes for Your Desired Part.
Request for Quote